MUSC Dean’s Suite Renovation – Clinical Sciences Building

LOC provided Mechanical, Piping/Plumbing, and Electrical Engineering Design and Construction Administration for renovation of the 9,700 square-foot Dean of Medicine Office Suite. The scope of work included phasing and construction sequencing required to continue operations while the facility is modified and upgraded. The study included an estimate of costs to implement facility modifications including documentation of a new lobby, conference rooms, current storage space, existing offices, workflow between offices, and analysis of future special needs. Features included new telecommunication path and new audio-visual systems in addition to replacement of lighting, HVAC, controls, and finishes.

Project Highlights

Cost: $1,000,000
Completion Date: 2012
Owner: Medical University of South Carolina
Charleston, SC

Services

  • Electrical Engineering
    • Power Distribution System
    • Power and Lighting Raceways
    • Interior Lighting
    • Raceway systems for Telephone, Data, Fire Alarm and Smoke Detection Systems
  • Mechanical Engineering
    • HVAC System Modifications and Additions
    • Plumbing and Fire Protection Design
Contact Us

We are always here and ready to assist you. Send us a message and we'll get back to you right away!

Not readable? Change text. captcha txt

Start typing and press Enter to search